Sunday 22 June 2008

Catch Up Blog - May.

Having got the marked out floor panel back to the CMF, it was cut out using a jigsaw and the rough edges filed until smooth.

Then is was loaded onto the CTV (now the Component Transfer Vehicle), and delivered to the VAB where it was clamped to the Rocket chassis.

The next step is to buy a compressor and some air tools to do the drilling and riveting.

The search for a suitable donor vechile is also underway but contary to everybodies belief, a 1.6 Category D Focus is not that easy to find.